In this case, the new post is about the new posts! The concrete is cured. Vertical measurements were taken and a new 4×4 was cut to that length.
And inserted.
The jack posts re-appeared for a bit to take out the temporary posts. And a sigh of relief from the jacks as they lowered back to a resting point.
And repeat.
One left. On the left.
Oh, the floor is now within a 1/2-1/4 bubble on a four ft. level. Once the third post is in, I’m thinking a second raise and a 1″ shim should do it for the middle and or right (north) posts.