In this case, the new post is about the new posts!  The concrete is cured.  Vertical measurements were taken and a new 4×4 was cut to that length.

And inserted.

The jack posts re-appeared for a bit to take out the temporary posts.  And a sigh of relief from the jacks as they lowered back to a resting point.dsc_0086

And repeat.

One left. On the left.

Oh, the floor is now within a 1/2-1/4 bubble on a four ft. level.  Once the third post is in, I’m thinking a second raise and a 1″ shim should do it for the middle and or right (north) posts.